The operating scope of this system is mainly based on the SYMC flat steel embryo storage area. Its scope begins with receiving the basic data of flat steel embryos and flat steel embryos. The storage area is planned based on the information brought by the flat steel embryos. It ends with the flat steel embryos being transported to the HSM (hot rolling mill) and then transported to other factories via lanes. The flat steel embryos data are summarized and sent to the ERP computer.
Assisted driver homework
Provide detailed and correct storage area and storage information for operators in the control room
Improve production efficiency
Master real-time situation on site
Hot embryo reception: When the flat steel embryo is received by SHF (flat steel embryo finishing workshop)
Cold embryo reception: When the flat steel embryo is received by SHF (flat steel embryo finishing workshop)
Return before the furnace: When the flat steel embryo is returned before the furnace by HSM (hot rolling mill)
Return after furnace: Flat steel embryos are returned by HSM (hot rolling mill)
Return: When the flat steel embryo is sent back by the truck
Into the furnace: When the flat steel embryo enters the HSM (hot rolling mill)
Back-finishing: When the flat steel embryo is returned to SHF (flat steel embryo finishing workshop)
Passing out of the channel: When the flat steel embryo is delivered by the truck
Improve operational efficiency
Reduce errors caused by manual data input
Real-time grasp on-site inventory information and reduce the quantity of long-term inventory